Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m

Product Details
After-sales Service: 24 Hours Online Service
Warranty: 12 Months Warranty Against B/L
Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008, ISO
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
2000000 RMB
Plant Area
1001~2000 square meters
  • Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m
  • Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m
  • Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m
  • Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m
  • Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m
  • Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m
Find Similar Products
  • Overview
  • Product Parameters
  • Features
  • Application Purpose and scope
  • Detailed Photos
  • Other Products
  • Sale service
  • Customer feedback
  • FAQ
Overview

Basic Info.

Condition
New
Motor
Diesel
Drill Hole Diameter
75mm/91mm/110mm/130mm/150mm/300mm
Drill Hole Depth
200m/150m/100m/70m/50m/30m
Bit Type
Diamond Bit
Drilling Way
Rotary
Type
Two-Wheel Trailer/Four-Wheel Trailer
Parts
Mud Pump
Packaging Weight (Kg)
1000kgs
Color
Red, Yellow, Green, White, Blue, Black
Delivery Time
10 Working Days
Key Selling Points
Easy to Operate
Drill Pipe Diameter (mm)
50
Power (kN)
15
Rig Weight (Except Motor)
525 Kgs
Vertical Stroke (mm)
450
Vertical Spindle Speed (R/Min)
115/230/505/1010
Power
22kw,36kw,42kw
Borehole Inclination(°)
90-75
Pump Flow
160L/Min
Feature
Portable, High Drilling Efficiency
Transport Package
Wooden Cases Packaging
Specification
1433*697*1273mm
Trademark
DTD/OEM
Origin
China
HS Code
8430691900
Production Capacity
50000pieces/Year

Product Description

Core Drilling Rig
 
Core Drilling Rig is a widely used, hydraulic feed drilling rig, with large power, large lifting force(2T), transmission torque and other characteristics.

Product Parameters

Machine Parameters Hole diameter (mm) 75/91/110/ 130/150/300
Drilling depth(m) 200/ 150/100/70/50/30
Drill pipe diameter(mm) 50
Borehole inclination(°) 90-75
Power(KN) 15
Rig weight(exceptmotor) 525
Drill size(L*W*H)(mm) 1433*697*1273
Vertical shaft Vertical spindle speed (r/min) 115/230/505/ 1010
Vertical stroke(mm) 450
Hoist Single rope lifting force (KN) 15
Drum speed (r/min) 19/38/84/ 168
Diameter of wirerope(mm) 9.3
Capacity of wire rope(m) 35
Oil pump Rated speed (r/min) 2000
Rated pressure(MPa) 12.5
Rate of flow(ml/r) 20
Package Wooden case(mm) 2100*1100*1800
Total CBM About 6 CBM, subject to the practice.
 

Features

1.With oil pressure feeding mechanism, improve drilling efficiency, reduce labor intensity of workers.
2.Large rotary torque and large opening diameter.
3.Large active drill pipe and double guide rods are used to increase stability.
4.The rig is equipped with a ball card holding mechanism and six square active drill pipe, which can be carried out non-stop rod down, high work efficiency, convenient operation, safety and reliable.
5. Equipped with pressure gauge at the bottom of the hole to indicate the pressure for easy to grasp the situation in the hole.
6.Handle centralized operation is convenient.
7.The drilling rig is compact in structure, small in volume, light in weight, strong in decomposition and easy to move.

Application Purpose and scope

1. Engineering geological survey of railway, hydropower, communications, Bridges, dam foundations and other buildings.
2. Geological core drilling and physical investigation.
3.Small grouting Confucius, blasting hole drilling.
4.Small well drilling.

Detailed Photos

Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m
Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m

Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200mBorehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m

 

Other Products

Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m

Sale service

Before-sale services:
1) 24 Hours online service, quickly reply for E-mail and online ask. Guide customers to choose the best applicable machine type.
2) Professionally and patiently introduction, provide the advanced, energy-saving and practical technological process.

Sale services:
1) complete parts safety stock for all machine series. Test every machine before delivery to insure good performance of machine.
2) In accordance with the agreements stipulated in the contract.

After-sale services:
1) According to the special requirements of customers,our company can ask professional engineers to guide with device installation online, debugging and training operators until customers are fully satisfied.
2) The quality guarantee period for machines is one year except the wearing parts and human damage factor.

Customer feedback

Borehole Drill Rig Mining Well Depth Core Mining Geological Core Drill Rig 200m

FAQ

  1.  Q:Are you manufacturer or trade company?
    A: We are manufacturer, we have our own factory. Our factory has department for exploitation , producing, sales, after-sell service, packing , warehouse, we can offer you best products and best service.
  2. Are you interested in dealership with local company?
    A: Yes, we are quite interested in this business cooperation. We'd like to cooperate with some local partner to sell more machines in local market and supply better service.We can discuss more if you also interested.

3. Q: Do you sell accessories for your machine?
A: Yes, all of matching accessories for our machine are on selling, we are willing to supply the matching parts to you with low price.

4.Q: What's your terms of packing?
A: Generally, we pack our goods in wooden cases.

5.Q: What's your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

6.Q: What's your terms of delivery?
A: EXW, FOB, CFR, CIF

7.Q: How about delivery time?
A: Generally, it will take 7 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

8. Q: How do you make our business long-term and good relationship?
A: 1. We keep good quality and competitive price to ensure our customers benefit;
2. We respect every customer as our friend, no matter where they come from;
3. If you have any feedback that is cherished to us, please send email to us.
  1. Q: Do you supply samples?
A: We support sample order .
  1. Others: OEM: Support technical changes.  

         Free train: plant training on installation and maintenance techniques.
QC: Quality inspection before delivery for each unit.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier